Investigations

União das Freguesias do Préstimo e Macieira de Alcoba

Automated case report generated from contract-level risk evidence.

Executive Highlights

3 companies receive 54.5% of total spend

15 of 19 contracts (78.9%) have active risk signals

Supplier concentration is low (HHI 0.1388)

Person-company link evidence is available for 0 of 13 winner companies (0%); 13 have no link data

Award timing distribution is within expected bounds: 36.8% in Mar/Jun/Sep/Dec; 0% in December

Key Metrics

Flagged Rate
flagged_contracts / total_contracts = 15 / 19 = 78.9%
HHI Concentration
HHI = Σ s_i² = 0.1388
Interpretation: low supplier concentration
Thresholds: low < 0.15; medium 0.15-0.25; high > 0.25
Company Awarded value Share
FLORESTA BEM CUIDADA, LDA. €110,967 27.3%
TOSCCA - EQUIP. EM MADEIRA LDA. €57,415 14.1%
Euroténis - Equipamentos Desportivos, Lda. €53,490 13.1%

Network Cluster Map

Main cluster focused on this entity with person-company links.

Whole Procurement Map

Global contract links across public bodies and companies

Public mode hides individual nodes and shows only connected-individual totals.

Loading network…

Navigate: drag to pan, use mouse wheel to zoom, and reset view when needed.

Legend Public body Company

Top 30 High-Risk Contracts

Highest combined risk score, with indicator evidence.

Contract Date Value Risk Evidence
Reflorestação da Floresta afeta à União de Freguesias de Préstimo e Macieira de Alcova. - Controlo de espécies invasoras; - Marcação e piquetagem; - Controlo de Vegetação Espontânea com motor roçadoras e covas manuais; - Plantação de Pinheiro Bravo; - Área total de 22,66 hectares.
9946875
2022-09-24 €7,035,930 130 (3)
A9 · Price Overrun (55)
base_price=74098.0 | total_effective_price=7035930.0
A2 · Late Publication (40)
publication_date=2023-04-24 | celebration_date=2022-09-24
A5 · Threshold Splitting (35)
base_price=74098.0 | threshold=75000.0
Ampliação de Instalações - Edificio da Junta em Á-dos-Ferreiros
10326032
2023-08-25 €3,231,877 95 (2)
A9 · Price Overrun (55)
base_price=32500.0 | total_effective_price=3231877.0
A2 · Late Publication (40)
publication_date=2023-11-03 | celebration_date=2023-08-25
Aquisição de um Braço Hidaulico – Limpa Bermas
9324015
2022-06-07 €19,738 75 (2)
A2 · Late Publication (40)
publication_date=2022-06-24 | celebration_date=2022-06-07
A5 · Threshold Splitting (35)
base_price=19738.0 | threshold=20000.0
Prestação de Prestação de Serviços como Cantoneiro de Limpeza
11616744
2025-06-30 €6,600 65 (2)
A2 · Late Publication (40)
publication_date=2025-07-31 | celebration_date=2025-06-30
C1 · Missing Supplier NIF (25)
rule=C1 no winner recorded: awarded contract (effective price > 0) has no supplier identified
Aquisição de serviços de cantoneiro de limpeza
11215506
2025-01-07 €13,200 65 (2)
A2 · Late Publication (40)
publication_date=2025-02-08 | celebration_date=2025-01-07
C1 · Missing Supplier NIF (25)
rule=C1 no winner recorded: awarded contract (effective price > 0) has no supplier identified
AQUISIÇÃO DE VIATURA LIGEIRA DE PASSAGEIROS DE 9 LUGARES
11168735
2024-07-24 €37,884 40 (2)
A6 · Low Competition (20)
rule=a6_single_bidder | bidder_count=1
C3 · Missing Mandatory Fields (20)
missing_fields=cpv_code | rule=C3 missing mandatory fields: cpv_code
Empreitada - Requalificação do Edifício Sede no Prestimo
11547916
2025-05-27 €10,578 40 (1)
A2 · Late Publication (40)
publication_date=2025-07-01 | celebration_date=2025-05-27
Construção de muro de Suporte no Parque Fluvial do Alfusqueiro
11457366
2025-05-09 €10,290 40 (1)
A2 · Late Publication (40)
publication_date=2025-05-22 | celebration_date=2025-05-09
Aquisição de um veículo ligeiro de passageiros de 9 lugares
9380376
2022-06-03 €23,935 40 (1)
A2 · Late Publication (40)
publication_date=2022-07-21 | celebration_date=2022-06-03
Pavimentação do parque de Estacionamento do Préstimo
8485392
2021-11-18 €13,805 40 (1)
A2 · Late Publication (40)
publication_date=2021-12-10 | celebration_date=2021-11-18
Construção Escadaria, em madeira, desde da Rua da Barreira até ao Outeiro da Vila, no centro de Macieira de Alcôba.
7303087
2020-11-09 €46,400 40 (1)
A2 · Late Publication (40)
publication_date=2020-11-20 | celebration_date=2020-11-09
Construção Parque Fitness em Á-dos-Ferreiros
7121409
2020-09-08 €9,032 40 (1)
A2 · Late Publication (40)
publication_date=2020-10-09 | celebration_date=2020-09-08
Construção de Parque Infantil em Á-dos-Ferreiros
6873859
2020-08-05 €22,217 40 (1)
A2 · Late Publication (40)
publication_date=2020-08-25 | celebration_date=2020-08-05
Empreitada de Construção de um Campo de Padel em Betão Poroso com Arrelvamento Sintético
5901660
2019-07-11 €30,000 40 (1)
A2 · Late Publication (40)
publication_date=2019-10-04 | celebration_date=2019-07-11
Implementação de medidas estabilizadoras nos caminhos afetados pela passagem do incêndio verificado em 2016.
3494535
2017-06-12 €35,865 40 (1)
A2 · Late Publication (40)
publication_date=2017-07-07 | celebration_date=2017-06-12

Award Timeline

Monthly award volume and amendment risk signals.

Period Awards Awarded value Amendment signals
2017-06 1 €35,865 0
2019-07 1 €30,000 0
2020-08 1 €22,217 0
2020-09 1 €9,032 0
2020-11 1 €46,400 0
2021-11 1 €13,805 0
2022-05 1 €23,490 0
2022-06 3 €59,093 0
2022-09 1 €7,035,930 0
2023-08 1 €3,231,877 0
2023-11 1 €12,500 0
2024-07 1 €37,884 0
2025-01 1 €13,200 0
2025-05 3 €31,437 0
2025-06 1 €6,600 0

Risk scoring combines rule-based indicators with data quality flags. Values and confidence degrade when critical fields are missing.