Energia BTN acima de 20,7 KVA

ID 1441418 · Portal BASE
Price
Base Price
€12,000 .00
Effective Price
€4,923 .00 -59.0%
Contract Details
Contract Type
Aquisição de bens móveis
Procedure
Ajuste Direto Regime Geral
CPV Code
09000000
Location
Portugal, Coimbra, Coimbra
Bidder Count
—
Winner
Galp Power, S.A
NIF 504723456
Company
Dates
Publication
27 Apr 2015
Celebration
27 Mar 2015
Contracting Entity
AC - Águas de Coimbra, EM
NIF 506566307
Public body
Data Source
Portal BASE
Api · synced 2026-04-17
Risk Flags
Score 100 · HIGH RISK
A1 · Repeat Direct Award
A1_REPEAT_DIRECT_AWARD
HIGH
Authority
2146
Supplier
15906
Number of Awards
22
Rule
A1 repeat direct award: 22 awards within 36 months
Detected 2026-03-06
A2 · Late Publication
A2_PUBLICATION_AFTER_CELEBRATION
HIGH
Publication Date
27 Apr 2015
Signing Date
27 Mar 2015
Days Late
31
Rule
A2/A3 late publication: 31 days after signing (threshold: 10)
Detected 2026-03-06
A9 · Abnormal Price Reduction
A9_PRICE_REDUCTION
LOW
Base price
12000.0
Total effective price
4923.0
Ratio
0.4103
Direction
reduction
Rule
A9 price reduction: ratio 0.4103 outside [0.5, 1.5]
Detected 2026-03-06